🪵

Closeboard Featheredge Fence Rail, Gravel Board & Post Concrete Sizer (Part B 60-Minute Fire-Resistant Structural Spec - Sheffield Region)

Regional calculation and trade specification for Sheffield calibrated to Part B 60-Minute Fire-Resistant Structural Spec.

⚙️ Sheffield Project Parameters
Reactive Edge Matrix
Estimated Regional Trade Cost (Sheffield)
£1,450
APPROVED (Approved Doc A-P)
Design Surface / Dimension: 25.0 m² / m
Calibrated Specification: Part B 60-Minute Fire-Resistant Structural Spec
Estimated Material Units: 28 packs / bags
Standard Wastage Built-in: 10% (BS 8000 Workmanship)
SPONSORED TRADE RESOURCES
Sheffield Estimate
£1,450
✓ Regional Bill of Quantities copied to clipboard!