🚽

Off-Grid Package Sewage Treatment Plant BS EN 12566 Population Sizer (Environment Agency Flood-Resilient Construction Spec - Aberdeen Region)

Regional calculation and trade specification for Aberdeen calibrated to Environment Agency Flood-Resilient Construction Spec.

βš™οΈ Aberdeen Project Parameters
Reactive Edge Matrix
Estimated Regional Trade Cost (Aberdeen)
Β£1,450
APPROVED (Approved Doc A-P)
Design Surface / Dimension: 25.0 mΒ² / m
Calibrated Specification: Environment Agency Flood-Resilient Construction Spec
Estimated Material Units: 28 packs / bags
Standard Wastage Built-in: 10% (BS 8000 Workmanship)
SPONSORED TRADE RESOURCES
Aberdeen Estimate
Β£1,450
βœ“ Regional Bill of Quantities copied to clipboard!