🪴

Outdoor Porcelain Paving Slab & MOT Type 1 Sub-Base Bulk Bag Calculator (Part B 60-Minute Fire-Resistant Structural Spec - Northampton Region)

Regional calculation and trade specification for Northampton calibrated to Part B 60-Minute Fire-Resistant Structural Spec.

⚙️ Northampton Project Parameters
Reactive Edge Matrix
Estimated Regional Trade Cost (Northampton)
£1,450
APPROVED (Approved Doc A-P)
Design Surface / Dimension: 25.0 m² / m
Calibrated Specification: Part B 60-Minute Fire-Resistant Structural Spec
Estimated Material Units: 28 packs / bags
Standard Wastage Built-in: 10% (BS 8000 Workmanship)
SPONSORED TRADE RESOURCES
Northampton Estimate
£1,450
✓ Regional Bill of Quantities copied to clipboard!