🌬️

Suspended Timber Ground Floor PIR Insulation & Telescopic Airbrick Sizer (Building Control Statutory Inspection Standard - Perth Region)

Regional calculation and trade specification for Perth calibrated to Building Control Statutory Inspection Standard.

⚙️ Perth Project Parameters
Reactive Edge Matrix
Estimated Regional Trade Cost (Perth)
£1,450
APPROVED (Approved Doc A-P)
Design Surface / Dimension: 25.0 m² / m
Calibrated Specification: Building Control Statutory Inspection Standard
Estimated Material Units: 28 packs / bags
Standard Wastage Built-in: 10% (BS 8000 Workmanship)
SPONSORED TRADE RESOURCES
Perth Estimate
£1,450
✓ Regional Bill of Quantities copied to clipboard!